TeamGantt vs Instagantt
Side-by-side from the Top 11 ranking of TeamGantt vs Contractor Foreman vs Fieldwire: 11 Best Construction Scheduling Software 2026. Last verified October 11, 2026.
The short answer
TeamGantt ranks higher on Top 11 (#1 vs #6) for Project managers and general contractors who plan and track job schedules and crews. A schedule first tool with a construction edition that lists lookahead schedules and subcontractor confirmation.
At a glance
| TeamGantt | Instagantt | |
|---|---|---|
| Top 11 rank | #1 / TeamGantt vs Contractor Foreman vs Fieldwire: 11 Best Construction Scheduling Software 2026 | #6 / TeamGantt vs Contractor Foreman vs Fieldwire: 11 Best Construction Scheduling Software 2026 |
| Score (out of 9.4) | 8.8 | 7.4 |
| Best for | Schedule first Gantt with a construction edition | Low cost Gantt with critical path and Asana sync |
| Pricing | $$$ ($59 to $199/mo, monthly billing) | $ ($0 to $24/mo, monthly billing) |
| HQ | — | — |
| Founded | — | — |
TeamGantt
A schedule first tool with a construction edition that lists lookahead schedules and subcontractor confirmation.
www.teamgantt.comInstagantt
Critical path, baselines and dependencies for $12 to $24 a month, with no construction features.
instagantt.comMethodology and scoring weights live at /methodology. No vendor pays for placement — see about.