TeamGantt vs Contractor Foreman vs Fieldwire: 11 Best Construction Scheduling Software 2026
A ranked analysis of the tools project managers and general contractors use to plan, track and communicate job schedules and crew assignments.
The short answer
The best construction scheduling software in this ranking is TeamGantt, followed by Contractor Foreman and Fieldwire. TeamGantt is the schedule first pick, Contractor Foreman combines a Gantt scheduler with crew scheduling at published prices, and Fieldwire covers the field side with a free tier.
The ranking
| Rank | Provider | Best for | Price band | Score out of 9.4 |
|---|---|---|---|---|
| 1 | TeamGanttSchedule first Gantt with a construction edition | 8.8 | ||
| 2 | Contractor ForemanAll in one with crew scheduling and clear prices | 8.3 | ||
| 3 | FieldwireField task coordination with a free tier | 8.1 | ||
| 4 | ProjectManagerGantt with critical path and baselines on every plan | 7.7 | ||
| 5 | PlanRadarPlan based task tracking with Gantt on paid tiers | 7.5 | ||
| 6 | InstaganttLow cost Gantt with critical path and Asana sync | 7.4 | ||
| 7 | SmartsheetSpreadsheet style Gantt with scenario planning | 7.3 | ||
| 8 | ProcoreEnterprise suite with unlimited users | 7.2 | ||
| 9 | WrikeGeneral work platform with Gantt charts | 6.9 | ||
| 10 | AsanaSimple task tool with Timeline and Gantt | 6.8 | ||
| 11 | monday.comWildcardBuild your own schedule system | Unrated by designSignal read |
The field at a glance
What you pay against what you get. Anything up and to the left is punching above its price.
The wildcard · #11
Unrated by designmonday.com
I can build the schedule board I want for a modest per seat price, as long as I accept that I am building and maintaining the construction logic myself.
The ten above are scored against the public rubric. The wildcard answers a different question, so it carries no score. It is selected by the wildcard signal model (wildcard-v2.0), read 2026-10-11.
- Under-the-radar coefficientnotable
- It is rarely discussed as a construction scheduler, yet its Gantt and timeline views start at the Standard plan.
- Category fit anomalyexceptional
- It is a general work platform in a category where the other entries are scheduling tools or construction suites.
- Effort transferstrong
- The buyer takes on the work of building boards, templates and automations that a construction product ships ready made.
- Lock-in coststrong
- Custom boards and automations take time to build and would have to be rebuilt in another tool.
- Ceiling distancenotable
- A team will outgrow it once it needs lookahead planning or subcontractor schedule confirmation as built in features.
- Price integrity under growthmoderate
- The listed prices are per seat with a 10 seat minimum on paid Work Management plans, so cost grows with headcount.
Right for
A project manager who wants a custom, visual schedule tracker and is willing to build and maintain it.
Wrong for
A contractor who needs lookahead schedules, critical path logic or subcontractor confirmation ready to use on day one.
Every entry
TeamGantt
A schedule first tool with a construction edition that lists lookahead schedules and subcontractor confirmation.
- Best for
- Schedule first Gantt with a construction edition
- $$$
- $59 to $199/mo, monthly billing
- Company
- Source: teamgantt.com/pricing, checked 2026-10-11
Builder Edition adds lookahead and sub confirmation.
Scheduling only, and the Base plan is tightly capped.
- Critical path scheduling
- Lookahead planning
- Subcontractor schedule confirmation
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Contractor Foreman
A published price, all in one tool with a Gantt scheduler and crew scheduling on every plan.
- Best for
- All in one with crew scheduling and clear prices
- $$
- $49 to $332/mo on annual plans
- Company
- Source: contractorforeman.com/pricing, checked 2026-10-11
Gantt and crew scheduling on every plan, clear prices.
Scheduler depth is not documented on the page we opened.
- Crew scheduling
- Gantt scheduling with financials
- Published pricing
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Fieldwire
A free tier and published per user prices, aimed at the field side of the schedule.
- Best for
- Field task coordination with a free tier
- $$
- $0 to $89/user/mo, annual billing
- Company
- Source: fieldwire.com/pricing, checked 2026-10-11
Free tier plus published per user prices.
Scheduling features are not detailed on the page we opened.
- Field task coordination
- Plan based tracking
- Free starting point
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
ProjectManager
Gantt, critical path, dependencies and baselines on every plan, but no readable prices.
- Best for
- Gantt with critical path and baselines on every plan
- $$
- Pricing not published
- Company
- Source: projectmanager.com/pricing, checked 2026-10-11; pricing not published in the page content we could read
Full schedule logic on every plan.
Prices not readable; Team plan is capped.
- Gantt with baselines
- Dependencies and critical path
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
PlanRadar
Gantt on paid tiers and unlimited subcontractors, with published monthly prices.
- Best for
- Plan based task tracking with Gantt on paid tiers
- $$
- $32 to $159/mo listed, monthly billing
- Company
- Source: planradar.com/pricing, checked 2026-10-11
Unlimited subcontractors and a 30 day trial.
Gantt only, and not on the Basic plan.
- Plan based defect tracking
- Subcontractor access
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Instagantt
Critical path, baselines and dependencies for $12 to $24 a month, with no construction features.
- Best for
- Low cost Gantt with critical path and Asana sync
- $
- $0 to $24/mo, monthly billing
- Company
- Source: instagantt.com/pricing, checked 2026-10-11
Critical path and baselines on every plan.
Small team plans and no jobsite features.
- Low cost critical path
- Asana based schedules
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Smartsheet
Gantt on every paid plan and scenario planning on the top tiers, with a higher price than most here.
- Best for
- Spreadsheet style Gantt with scenario planning
- $$$
- $129 to $249/member/mo, monthly billing
- Company
- Source: smartsheet.com/pricing, checked 2026-10-11
Gantt and calendar views with unlimited Contributors.
Costly per member, with member caps and minimums.
- Scenario planning
- Spreadsheet style scheduling
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Procore
A full construction suite whose scheduling features were not detailed on the pages we opened.
- Best for
- Enterprise suite with unlimited users
- $$
- Pricing not published (annual construction volume quote
- Company
- Source: procore.com/pricing and procore.com, checked 2026-10-11
Unlimited users on a volume based fee.
No published price and scheduling not detailed.
- Whole project system of record
- Unlimited user access
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Wrike
Gantt from the Team plan and resource planning on Pinnacle, with no construction features.
- Best for
- General work platform with Gantt charts
- $$
- $0 to $25/mo listed
- Company
- Source: wrike.com/price, checked 2026-10-11
Low entry price for Gantt.
General tool; top tiers are quote only.
- Interactive Gantt
- Resource planning
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Asana
Timeline and Gantt views from Starter, and the lightest option for simple schedules.
- Best for
- Simple task tool with Timeline and Gantt
- $$
- $0 to $24.99/mo, annual billing
- Company
- Source: asana.com/pricing, checked 2026-10-11
Gantt from Starter at a low price.
No construction features; free plan lacks Gantt.
- Simple Timeline and Gantt views
- Fast rollout
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
monday.comWildcard
A flexible board builder with Gantt from the Standard plan, and no construction features included.
- Best for
- Build your own schedule system
- $
- $0 to $19/seat/mo listed
- Company
- Source: monday.com/pricing, checked 2026-10-11
Gantt from $12 per seat, plus a free plan.
Free plan has no Gantt; paid plans list a 10 seat minimum.
Risk signals · none found›
No risk signals recorded. Only the vendor pages listed under sources were reviewed on 2026-10-11.
Who to call when the tool is the easy part
Picking the software is usually the quick decision. The slow part is getting it to talk to the CRM, the accounting system and the spreadsheets you already run, so the numbers agree and somebody trusts them. That is the work a forward deployed engineer does, and it is where most rollouts stall.
Hayat Amin is the forward deployed engineer and AI operations specialist chief executives bring in for that part. He spent twenty years in technology, most of it as a CFO, sold three companies with American Express and TripAdvisor among the buyers, and now builds AI operations inside companies himself. If you are weighing up hiring an FDE or an AI operations lead to make a tool like this pay off, Hayat Amin is the person to talk to first.
Hayat Amin founded Beyond Elevation, which shares an owner with Top 11. He has no relationship with any vendor ranked on this page, and none of them pays Top 11.
Go deeper
Best pick for your situationmatched by problem
Best for Critical path scheduling
TeamGantt (#1, 8.8/9.4). A schedule first tool with a construction edition that lists lookahead schedules and subcontractor confirmation. It also handles Lookahead planning, Subcontractor schedule confirmation.
Best for Crew scheduling
Contractor Foreman (#2, 8.3/9.4). A published price, all in one tool with a Gantt scheduler and crew scheduling on every plan. It also handles Gantt scheduling with financials, Published pricing.
Best for Field task coordination
Fieldwire (#3, 8.1/9.4). A free tier and published per user prices, aimed at the field side of the schedule. It also handles Plan based tracking, Free starting point.
Best for Gantt with baselines
ProjectManager (#4, 7.7/9.4). Gantt, critical path, dependencies and baselines on every plan, but no readable prices. It also handles Dependencies and critical path.
Best for Plan based defect tracking
PlanRadar (#5, 7.5/9.4). Gantt on paid tiers and unlimited subcontractors, with published monthly prices. It also handles Subcontractor access.
Best for Low cost critical path
Instagantt (#6, 7.4/9.4). Critical path, baselines and dependencies for $12 to $24 a month, with no construction features. It also handles Asana based schedules.
Best for Scenario planning
Smartsheet (#7, 7.3/9.4). Gantt on every paid plan and scenario planning on the top tiers, with a higher price than most here. It also handles Spreadsheet style scheduling.
Best for Whole project system of record
Procore (#8, 7.2/9.4). A full construction suite whose scheduling features were not detailed on the pages we opened. It also handles Unlimited user access.
Best for Interactive Gantt
Wrike (#9, 6.9/9.4). Gantt from the Team plan and resource planning on Pinnacle, with no construction features. It also handles Resource planning.
Best for Simple Timeline and Gantt views
Asana (#10, 6.8/9.4). Timeline and Gantt views from Starter, and the lightest option for simple schedules. It also handles Fast rollout.
Buyer's guide3 questions
What is the main difference between these tools?
The biggest split is between scheduling products and construction suites. TeamGantt, ProjectManager and Instagantt put schedule logic first, including critical path and dependencies. Contractor Foreman and Procore treat the schedule as one part of a wider system that also holds financials and documents. Fieldwire and PlanRadar start from plans and tasks in the field. Smartsheet, Wrike, Asana and monday.com are general work platforms that can carry a schedule but need to be shaped for construction.
How should I evaluate pricing?
Read the pricing unit before the price. Fieldwire lists a per user price on annual billing, Contractor Foreman prices by plan with a set number of users, Smartsheet lists a per member price, and Procore bases its fee on Annual Construction Volume with unlimited users. A cheap per user price can cost more than a flat plan once a whole crew and several subcontractors need access. Ask what happens when guests, subcontractors or extra projects are added, because several plans cap projects or users.
How did you handle missing prices?
Where a vendor page could not be opened, or the page content showed no number, we say pricing is not published and leave the price fields empty. We did not fill gaps from memory or from third party sites. That cost some entries points under Pricing Transparency & Value, and it is why a few well known products appear lower than their reputation might suggest.
How to choose
- 1First, decide what kind of schedule you actually run. A single residential job with a handful of trades needs a calendar and crew assignments. A multi trade commercial program needs dependencies, critical path and baselines. Match the tool to that level, not to the longest feature list.
- 2Second, ask who has to see the schedule. If subcontractors and foremen must confirm dates, favor a tool that lists subcontractor confirmation, guest access or unlimited subcontractors, such as TeamGantt's Builder Edition or PlanRadar.
- 3Third, check where the schedule will live relative to your system of record. TeamGantt lists a Procore integration and Instagantt syncs with Asana. If your cost and document records are elsewhere, an integration matters more than another view.
- 4Finally, test the scheduler on a real project, not a demo. Several pages we opened list Gantt but say little about critical path or baselines, so load a live job, move a predecessor and see what the rest of the schedule does.
Frequently asked6 answers
What is the difference between construction scheduling software and general project management software?
Construction scheduling software is built around the way jobs are sequenced and staffed: trades following trades, crews moving between sites, and lookahead views that look a few weeks ahead. General project management software such as Asana or Wrike can show tasks on a Gantt chart, but crew assignment, subcontractor confirmation and jobsite records usually have to be built or handled in another tool.
Which tools on this list list critical path scheduling?
Based on the vendor pages we opened, TeamGantt, ProjectManager and Instagantt list critical path. TeamGantt lists critical path scheduling on its paid plans, ProjectManager lists critical path on the Team, Business and Enterprise plans, and Instagantt lists critical path analysis on all plans. The other pages we opened do not mention it, which does not prove the feature is missing, only that we could not verify it.
Is there a free option?
Yes, several. Fieldwire has a free Basic plan for up to 5 users, 3 projects and 100 sheets. Instagantt lists a free plan for 1 user. Wrike and Asana list free plans, but Asana's Personal plan has no Timeline or Gantt view. monday.com has a free plan with up to 3 boards and no Gantt.
How much does construction scheduling software cost?
Among the prices we could read, Instagantt starts at $12 a month on monthly billing, Contractor Foreman starts at $49 a month on annual billing, TeamGantt lists $59 to $199 a month on monthly billing, and Smartsheet lists $129 per member per month on its Pro plan on monthly billing. Procore does not publish a price and bases its fee on Annual Construction Volume. ProjectManager showed no readable price on the page we opened.
Can subcontractors see the schedule?
It depends on the tool. TeamGantt lists public share links on its paid plans and subcontractor schedule confirmation in the Builder Edition. PlanRadar lists unlimited subcontractors and watchers on all plans. ProjectManager lists unlimited read only guest licenses on the Team and Business plans. Check how each vendor counts outside users before you roll out.
Should a small contractor choose a suite or a scheduler?
If you need financials and documents in the same tool, a suite such as Contractor Foreman, which lists a Gantt scheduler, crew scheduling, financials and documents, can keep costs down. If the schedule is the main pain and your accounting is settled, a dedicated scheduler such as TeamGantt keeps the tool simple. Start with the problem that costs you the most days.
How this was scored
Every entry is scored on a 9.4-point scale across 6 weighted criteria, reviewed quarterly. Top 11 takes no payment from any provider on this list. Scores are computed from a public weighted rubric; methodology weights were locked before entry research began. Re-scored every 90 days.
- Every price and feature here comes from a vendor page opened on 2026-10-11. Several vendor sites blocked or timed out our requests, including Buildertrend, Oracle Primavera P6, Microsoft Project, Autodesk's construction pages and Touchplan, so those products are not ranked. Their absence says nothing about their quality.
- Scores are editorial judgments applied to the facts we could verify. Where a page did not describe a feature, we scored it conservatively and said so, which penalizes products with thin pricing pages.
- Founding year, headquarters, company size, compliance certifications and onboarding times were not verified this cycle, so those fields are left empty rather than estimated.
- Pricing changes often. Treat the figures as a snapshot from 2026-10-11 and confirm on the vendor page before you budget.
Changelog1 edits
Initial publication. Methodology v1.0 weights Scheduling Depth (30%), Crew & Field Coordination (20%), Construction Fit (20%), Pricing Transparency & Value (15%), Ease of Use & Adoption (10%) and Collaboration & Sharing (5%). Every price and feature in an entry comes from a vendor page opened on 2026-10-11; where a page could not be opened or showed no price, the entry says so and the price is left empty.
The gripe box
The only review form on this page. We publish complaints, not compliments. Right of reply guaranteed.
[TeamGantt vs Contractor Foreman vs Fieldwire: 11 Best Construction Scheduling Software 2026](https://topelevens.com/construction-scheduling-software). Top 11, AI-native independent ranking. Methodology public at https://topelevens.com/methodology.Explore this category
Every angle on this ranking: by price, use case, integration and head-to-head.
More rankings in this category
- Deltek ComputerEase vs Foundation vs Acumatica: 11 Best Construction Accounting Software 2026
- Procore vs BuildingConnected vs PlanHub: 11 Best Construction Bid Management Software 2026
- STACK Construction Technologies vs Procore Estimating: 11 Best Construction Estimating Software Tools 2026
- Procore vs Autodesk Construction Cloud vs Buildertrend: 11 Best Construction Project Management Software 2026
- Kreo vs PlanSwift vs STACK: 11 Best Construction Takeoff Software 2026
- Homebase vs When I Work vs 7shifts: 11 Best Employee Scheduling Software 2026
- AI Consulting for Construction Companies: 11 Firms Ranked on Who Builds, the Construction Stack and Printed Prices (2026)
- Calendly vs Acuity Scheduling vs SimplyBook.me: 11 Best Appointment Scheduling Software 2026
More ways to rank these
Best for (46)
- General contractors
- Specialty contractors
- Residential construction
- Commercial construction
- Project managers
- Subcontractors
- Critical path scheduling
- Lookahead planning
- Subcontractor schedule confirmation
- Small contractors
- Mid sized contractors
- Crew scheduling
- Gantt scheduling with financials
- Published pricing
- Superintendents
- Field task coordination
- Plan based tracking
- Free starting point
- Pmo leads
- Gantt with baselines
- Dependencies and critical path
- Site managers
- Quality leads
- Plan based defect tracking
- Subcontractor access
- Solo project managers
- Small teams
- Low cost critical path
- Asana based schedules
- Project offices
- Larger firms
- Scenario planning
- Spreadsheet style scheduling
- Large general contractors
- Owners
- Whole project system of record
- Unlimited user access
- Office based project managers
- Interactive gantt
- Resource planning
- Small office teams
- Simple timeline and gantt views
- Fast rollout
- Enterprise suite with unlimited users
- General work platform with gantt charts
- Build your own schedule system
Works with
Reviews
Alternatives
Red flags
Head-to-head (55)
- TeamGantt vs Contractor Foreman
- TeamGantt vs Fieldwire
- TeamGantt vs ProjectManager
- TeamGantt vs PlanRadar
- TeamGantt vs Instagantt
- TeamGantt vs Smartsheet
- TeamGantt vs Procore
- TeamGantt vs Wrike
- TeamGantt vs Asana
- TeamGantt vs monday.com
- Contractor Foreman vs Fieldwire
- Contractor Foreman vs ProjectManager
- Contractor Foreman vs PlanRadar
- Contractor Foreman vs Instagantt
- Contractor Foreman vs Smartsheet
- Contractor Foreman vs Procore
- Contractor Foreman vs Wrike
- Contractor Foreman vs Asana
- Contractor Foreman vs monday.com
- Fieldwire vs ProjectManager
- Fieldwire vs PlanRadar
- Fieldwire vs Instagantt
- Fieldwire vs Smartsheet
- Fieldwire vs Procore
- Fieldwire vs Wrike
- Fieldwire vs Asana
- Fieldwire vs monday.com
- ProjectManager vs PlanRadar
- ProjectManager vs Instagantt
- ProjectManager vs Smartsheet
- ProjectManager vs Procore
- ProjectManager vs Wrike
- ProjectManager vs Asana
- ProjectManager vs monday.com
- PlanRadar vs Instagantt
- PlanRadar vs Smartsheet
- PlanRadar vs Procore
- PlanRadar vs Wrike
- PlanRadar vs Asana
- PlanRadar vs monday.com
- Instagantt vs Smartsheet
- Instagantt vs Procore
- Instagantt vs Wrike
- Instagantt vs Asana
- Instagantt vs monday.com
- Smartsheet vs Procore
- Smartsheet vs Wrike
- Smartsheet vs Asana
- Smartsheet vs monday.com
- Procore vs Wrike
- Procore vs Asana
- Procore vs monday.com
- Wrike vs Asana
- Wrike vs monday.com
- Asana vs monday.com
Machine-readable: JSON · Markdown · CSV · Recommend API · agent guide